| |
|
|
|
 |
Thank You for your interest in our Projects
We believe that this is the most important section of our site.Please tap on View Details to expand any catagory.Thank You again for visiting.Peter E Beck president
|
 |
| |
|
|
|
 |
THEATER ROOMS
This is a full stretched fabric room under contruction
|
 |
| |
|
|
|
 |
RUNCO PLASMA WITH AUTON LIFT
THIS IS RUNCO'S 50" PLASMA WITH A AUTON CEILING LIFT. WE MADE THE MAPLE CABINETRY IN OUR SHOP THAT SURROUNDS THE TV. THE LEFT ,CENTER AND RIGHT SPEAKERS ARE SONANCE ELIPSE.
|
 |
| |
|
|
|
 |
Cabinetry
We design build and install cabinetry. Please click on view details for pictures of more cabinets
|
 |
| |
|
|
|
 |
PIONEER ELITE PLASMA WITH MOREL SPEAKERS
|
 |
| |
|
|
|
 |
PIONEER WITH IN WALL PEERLESS MOUNTING
THIS INSTALL ALLOWS THE PLASMA TO BE PUSHED ALL THE WAY BACK FLAT AGAINST THE WALL.
|
 |
| |
|
|
|
 |
Panasonic with custom colored Leonspeakers hz-414-lcr
|
 |
| |
|
|
|
 |
Fran and Marks mahogany cabinet
|
 |
| |
|
|
|
 |
Tom's plasma over fireplace with subs
|
 |
| |
|
|
|
 |
Jim's 60 Zenith with a custom frame built buy him
|
 |
| |
|
|
|
 |
Jim's 42" runco with ceiling boston speakers
|
 |
| |
|
|
|
 |
Picture framed Plasma
Why not build your plasma into the wall? We placed the front speakers behind grillcloth in the lower frame. Your center speaker could go here with the right and left on the book shelves, or all three speakers could go behind this grill. A fan system by active thermal ws also installed for cooli
|
 |
| |
|
|
|
 |
Ben and Micky's curly maple cabinet
To help with the clutter problem ,these clients asked us to build them a cabinet to match their existing coffee table.
|
 |
| |
|
|
|
 |
Bill's in wall plasma with triad 5.1 speaker system
|
 |
| |
|
|
|
 |
Plasma with painted frame
|
 |
| |
|
|
|
 |
John's cabinet with rear projection system
|
 |
| |
|
|
|
 |
Bill and Donna's theater room
|
 |
| |
|
|
|
 |
House For Rent
This House is only 1 year old.
|
 |
| |
|
|
|
 |
Why sould you use us?
We have been serving the needs of home theater installations princeton n.j. needs for over 8 years.
|
 |